Our Subsidiaries

KLK YAPI INC.

KLK YAPI INC.

KLK YAPI Inc., %100 subsidiary of Kulak Construction Company, was founded in 2012 in Istanbul by creating specialized technical and administrative staff in the real estate sector in Istanbul. Vision of KLK YAPI Inc. is to combine 70 years of construction experience with a dynamic, innovative management approach and participate Turkey’s most preferred habitat manufacturers. Mission of KLK YAPI Inc. is to raise the quality of life, develop environmentally friendly projects, while building the projects without compromising customer satisfaction, employee safety and health; ensure continuity before and after the sale.

AKSAR NAZAR ENERJI URETIM LIMITED COMPANY

AKSAR NAZAR ENERJI URETIM LIMITED COMPANY

Akşar Regulator and Nazar Hydroelectric Plant Projects are situated on Sutopu River within the boundaries of Hizan district of Bitlis, in the Eastern Anatolia Region. Aksar Regulator, has a total area of 1000.10 square kilometers precipitation on stream, turns the water to Nazar Hydroelectric Plant. Aksar Regulator and Nazar Hydroelectric Plant is the planned project between 1025-1125 meters of elevation. The project is located 7 kilometers southeast of the Hizan district within the boundaries of 1/25000 scale Van-L48-c2 layouts 42 ° 25' 30 "-42 ° 29' 30" east longitude and 38 ° 08 '00 "-38 ° 12 '00 "north latitude. Aksar Regulator is approximately 6 kilometers southeast of the town center, 3 kilometers away from north of the town, on the outskirts Mimisilah on Sutopu, it will be installed in the concrete weight body type at 1113.00 and 1125.00 meters thalweg m crest elevation. "Nazar Hydroelectric Power Plant" is located to the south of 9.5 kilometers away to Hizan district, 6 kilometers away from southwest of the Deliktas Quarter location, Nazar River is in the downstream of the junction point of a continuation of Kesendere river, it is located on the right bank of the Kesendere with approximately 1025 meters elevation length.

GURUZ ELEKTRIK URETIM LIMITED COMPANY

GURUZ ELEKTRIK URETIM LIMITED COMPANY

As a result of the interest of Kulak Group in the Energy industry, various studies have been conducted in this field even before the Electricity Market Law No. 4628 was enacted in 2001, and a new period started mainly with the establishment of a department within the Regional Directorate of Ankara in 2007. The studies have focused especially on renewable energy sources, and some projects related to this issue have been made and evaluated. In 2007, a pilot project has been chosen in Sivas/Egerci region for Hydroelectric Power Plants (HEPP) which has a special status for the company; by being the first project for this sector.

Our pilot project is Tuztası HEPP within Guruz Elektrik Uretim Ltd. Sti. (A Kulak company), and its power is 1.6 MW and its annual power generation anticipated is 8.000.000 kWh. While construction processes of the pilot project continue, projects that have the characteristics aimed for new investments are being evaluated at the same time.

The company is also interested in Solar Energy Production systems as well as HEPPs and is working on feasibility of various projects as well as technological researches on this issue.

Advanced studies in projects are being conducted with various consultants that are experts on hydrology, geology, formulation, optimization and production costs where necessary, as well as a qualified Project Engineering company which is cooperating in projecting of HEPPs.

KLK ELEKTRIK URETIM LIMITED COMPANY

KLK ELEKTRIK URETIM LIMITED COMPANY

It was established to generate electricity from solar energy within the districts of Tefenni-Burdur.