3rd stage of sales continues at Kulak Kent

3rd stage of sales continues at Kulak Kent

The largest project of Adana city’s, Kulakkent is continuing with 3rd stage of sales in full speed. Provided with sample houses with furniture to accessories for your pleasure, customers can review and evaluate every opportunity possible for the
Kulak Kent met its visitors in the Construction Fair

Kulak Kent met its visitors in the Construction Fair

  While the 3rd stage of sales are continuing with full speed with Kulak kent, Adana’s largest project, details were introduced at “TUYAP 9th Construction Technologies , Work and Construction Machinery Fair”. The Kulakkent Project, with the assurance of Kulak Construction Inc. which is one of Turkey’s most established construction company, who has its signature in large number of valuable projects also in the international area; is pursuing its largest project in rapidly developing district of Yureğir in Adana with its “KulakKent Project” in the rapidly developing district of Adana The project was introduced to visitors at 9th Construction Fair arranged by TUYAP International Exhibition Centre. In attendance of the TUYAP fair, the company officials, indicating continued rapid sales of the 3rd stage of construction mentioned: Site features rise living standards Providing rich social facilities with quality, eligibility and reliability of life in economical prices, creates great interest at Kulakkent. Bank loans are ready for payment and that offers very attractive facilities for those who want to become home owners. Settling in 120 thousands square meters of construction area, Kulakkent ‘s housing possibilities vary between 84 square meters to 237 square meters range , including options of 4 different apartment options of 1+1, 2+1, 3+1 and 4+1. Playgrounds, sports fields, a fitness room, indoor parking , hiking trails and sports equipment located in the garden, designed by Kulakkent that promises clients a comfortable and safe life with its site equipment’s and apartment properties. The result of project’s location close to the main points such as city center, bus station, state hospital, central park and industrial zones; it offers great advantages in
Dazzling architecture with 5 star hotel in Abu Dhabi

Dazzling architecture with 5 star hotel in Abu Dhabi

The 5 Star Hotel Project is being constructed by Kulak Construction Inc. , sets to become one of the aesthetic architectural design icon of the city. The hotel with the sea view that is scheduled for completion in 2017, there are 267 standard, 34 connection, 60 suite, 4 presidential suites and 8 handicapped rooms. The hotel also has spacious lobby , 13 à la carte restaurant , coffee shop , snack bar, business center, children's club, a multipurpose hall , retail space , a cinema room, hobby room, spa center, bath and indoor swimming pool
Mersin ports is developing

Mersin ports is developing

The rapidly ongoing structure, Mersin Port Development Project, Construction of New Container Berth and Civil Infrastructure will change the face of Mersin. The rapid ongoing construction of the project by Kulak Construction Inc. includes that; along the waterfront navigation channel for scour protection scanning approximately 90,000 cubic meters, all screened materials discharging the waste dump away from the shore , the remove of the removal of the existing gravity type concrete blocks, sea excavation, removal and using of suitable material, slaughter and processing of concrete blocks, in the area of the new land reclamation, the material provided with the outside, with approximately 175,000 cubic meters of reclamation work, necessary shore protection works, protection against forced carving and slope protection works and quay
Major Project to Bitlis

Major Project to Bitlis

Aksar Nazar Hydroelectrıc Power Plant Project, by Aksar Nazar Enerji Uretim Inc. , subsidiary of Kulak Construction Inc., that will serve with 30.24 MW. of capacity, is located on the Sutopu River in Eastern Anatolian Region, within the area of Bitlis province, Hizan district. The project that has 1.000 kilometers catchment area is planned to be completed on the month of September, in the year of