Follow us:

RESIDENTAL BUILDINGS

Kulak İnşaat

PERMANENT BUILDING COMPLEX CONSTRUCTION – BIRECIK, SANLIURFA/TURKEY

PROJECT NAME: PERMANENT BUILDING COMPLEX CONSTRUCTION

LOCATION: BIRECIK, SANLIURFA/TURKEY

STARTING/ENDING DATE:  23 MARCH 1996/28 FEBRUARY 1999

CLIENT: HOLZMANN-GAMA-STRABAG JOB PARTNERSHIP OF CONSTRUCTION’S WORKS; BIRECIK DAM AND HES CONSTRUCTION

PROJECT DESCRIPTION: THE WORK CONSISTS OF CONSTRUCTING AN INTEGRAL SITE FOR THE OPERATORS OF THE HYDROELECTRIC DAM ON THE FIRAT RIVER. EVERYTHING STARTED FROM SCRATCH TO THE COMPLETION OF A SMALL TOWN. THE BASIC DESIGNS WERE DONE BY JOINT VENTURE DESIGNERS. BUT THE ACTUAL DISTRIBUTION OF THE HOUSING AND OTHER COMMON BUILDINGS WERE DONE BY OUR DESIGN PROPOSALS AND THE DESIGN OFFICE COLLABORATION. A- THE WORK INCLUDED BACHELOR HOUSINGS, FLATS, FAMILY HOUSINGS (SINGLE AND DOUBLE), RESTAURANTS, CLUB-HOUSE, SCHOOL, GYMNASIUM, CHURCH, GAS STATION, ENTRANCE BUILDING, SOCIAL BUILDING, ADMINISTRATION BUILDING, TENNIS COURTS, SWIMING POOL, TODDLER’S POOL, SAUNAS, AND SHOPPING MALL. B- THE WORK INCLUDES THE SITE ARRANGEMENT, LAND SCAPING, ROADS, WALKWAYS, STREET LIGTING, TV DISTRIBUTION SYSTEM, TELEPHONE DISTRIBUTION SYSTEM, HIGH MEDIUM AND LOW VOLTAGE ELECTRICAL DISTRIBUTION, DRAINAGE SYSTEMS, DRAINAGE CHANNELS, RAW WATER COLLECTION FOR THE DAM, RAW WATER DISTRIBUTION , WASTE WATER COLLECTION, FIRE WATER DISTRIBUTION, RAW WATER HEADER TANK, POTABLE WATER HEADER TANK AND DISTRIBUTION, FIRE HYDRANTS, RETAINING WALLS, PERGOLAS, WASTE WATER TREATMENT PLANT AND PUMPING STATION, SUB-TRANSFORMERS AND CHILLER ROOMS.